The Mathioya Water Supply Project focused on enhancing the reliability and resilience of the water system through specialized electrical and mechanical works. This included the installation of backup power and surge protection to ensure continuous operation under varying conditions.
By integrating a standby generator and surge control equipment, the project strengthens the system’s ability to maintain uninterrupted water supply, even during power outages or pressure fluctuations.
Scope of Work:
1. Standby Power – Installation of an 80 KVA standby generator to guarantee reliable operation of pumps and equipment during electrical outages.
2. Surge Equipment – Provision of surge protection devices to safeguard pipelines and mechanical systems against sudden pressure changes.
3. Electrical/Mechanical Works – Comprehensive works to integrate new equipment seamlessly into the existing water supply infrastructure.
Key Benefits:
- Continuous water supply even during power interruptions.
- Protection of pipelines and pumping systems against damage caused by pressure surges.
- Improved reliability and efficiency of the overall water distribution system.
- Enhanced resilience of infrastructure, ensuring long-term sustainability.
The Mathioya Water Supply Project highlights the importance of integrating electrical and mechanical solutions into water systems, ensuring dependable service delivery and safeguarding vital infrastructure for the community.